JNC TN8440 2000-013, 179 Pages, 2000/04
The plutonium conversion development facility (PCDF) has been operated for 17 years and about 12 tons plutonium-uranium mixed oxide (MOX) powder has been converted since operation started in 1983. The first maintenance program for aging of apparatus was carried out from 1993 to 1994. The calcination-reduction fumace, liquid waste evaporator had been dismantled and renewed. The second maintenance program was carried out form 1998 to 1999. The microwave ovens, powder blender, ventilation control panel and so on were dismantled and renewed. Large volume radioactive wastes were generated during this maintenance such as the furnace, the filter casings and glove boxes. These wastes were too large to be packed into the waste container and these wastes were polluted by MOX powder unfixed on these surface. SO cutting and packing operation for these wastes and recovery of MOX powder from them were carried out. In this report, the method of this cutting and packing operation, the radioactive exposure to the operators in this operation, the estimation of nuclear material quantity migrated to filters, the evaluation of re-floating factor of radioactive material, etc. were discussed.
; ; Yamada, Takeshi; ; ; ; Kaito, Yasuaki; ; Kotaka, Yoshinori; ; et al.
PNC TN2410 96-005, 339 Pages, 1996/03
Construction of the 'Monju' fuel handling systems was completed in April, 1992. From March 1991 to August 1992, pre-commissioning tests were carried out. In December 1992, all the systems of Monju were transfered to PNC, and commissioning tests and reactor physics tests, were started. For the first time, during these physics tests, the fuel handling systems were operated for one of the commissioning tests 'Loading to Criticality', without significant problems. 168 fuel sub-assemblies were loaded into the core and the first criticality was achieved on 5th April 1994. The fuel handling systems continued in operation for the 'Loading to Full Size of the Core', power distribution test and for cleaning discharged dummy sub-assemblies. To keep these fuel handling systems working somothly and satisfactorily annual maintenance has been carried out since 1992. This paper describes the operation and maintenance experience of fuel handling systems after the pre-commissioning tests and future study items for system reliability improvement.
; Nakano, Tomoyuki; *; *; Asami, Makoto*; Tanimoto, Kenichi; Enokido, Yuji
PNC TN9080 92-001, 107 Pages, 1992/01
None
Yamashita, Kiyoto; Maki, Shota; Yokosuka, Kazuhiro; Fukui, Masahiro; Iemura, Keisuke
no journal, ,
no abstracts in English